For Unidata this was an electrical project involving the construction of a new data centre within the basement of an existing building. Other works included new HV switch, new HV/LV transformer, 4 x pillar rotary UPS modules, static switched and a new LV switch panels, along with an extensive range of sub-main cabling.
Previous Project - 199, Bishopsgate, London
As part of a ten floor refurbishment program for ABN Amro at 199 Bishopsgate, Unidata were awarded t...
Read more
Previous Project - London Wall
Unidata were responsible for the 17 floors of a fully occupied premises for 400 staff including 5 fl...
Read more
Previous Project - Triton Square
Unidata had responsibility for the ground floor conversion into a data centre of No.1 Triton Sq...
Read more
Previous Project - Welwyn Data Centre
As principle contractor Unidata undertook a fit out of the data hall 1. These works included the upg...
Read more
Previous Project - 250, Bishopsgate, London
Unidata have a team of engineer’s permanently employed at this office location carrying out the mana...
Read more
Previous Project - One New Change
Unidata's involvement was to Introduce automatic Solar Blinds to achieve Building Control requi...
Read more