Unidata were responsible for the 17 floors of a fully occupied premises for 400 staff including 5 floors of financial traders. Upon commencement of the project, the build load was transferred to source A via 3 x 500KVA UPS systems and associated services and test functional operation of the systems. Decommission and removal of redundant Static UPS system, batteries chilled water system and flush pipework/commission.125 london wall