As principle contractor Unidata undertook a fit out of the data hall 1. These works included the upgrade of PDUs with extension sections being added to 4No, installation of low level cabinet power, relocation of lighting to suit the new cabinet positions, a new under flooring earthing system to provide earthing points for the cabinets installation of new access control to the data hall, fire alarm detectors, BMS upgrades for temperature sensors within the cabinets, floor grilles were relocated to new locations to provide cooling for cabinets. 
Previous Project - Welwyn Data Centre
As principle contractor Unidata undertook a fit out of the data hall 1. These works included the upg...
Read more
Previous Project - London Wall
Unidata were responsible for the 17 floors of a fully occupied premises for 400 staff including 5 fl...
Read more
Previous Project - 250, Bishopsgate, London
Unidata have a team of engineer’s permanently employed at this office location carrying out the mana...
Read more
Previous Project - Triton Square
Unidata had responsibility for the ground floor conversion into a data centre of No.1 Triton Sq...
Read more
Previous Project - 199, Bishopsgate, London
As part of a ten floor refurbishment program for ABN Amro at 199 Bishopsgate, Unidata were awarded t...
Read more
Previous Project - One New Change
Unidata's involvement was to Introduce automatic Solar Blinds to achieve Building Control requi...
Read more