Unidata installed the complete structured cabling system over two floors, 10,000 outlets utilising the Ortronics, coloured trackjack system, was wired from one central equipment room located on the ground floor, between comms rooms and one satellite comms room situated on the first floor.
Previous Project - Triton Square
Unidata had responsibility for the ground floor conversion into a data centre of No.1 Triton Sq...
Read more
Previous Project - 250, Bishopsgate, London
Unidata have a team of engineer’s permanently employed at this office location carrying out the mana...
Read more
Previous Project - 199, Bishopsgate, London
As part of a ten floor refurbishment program for ABN Amro at 199 Bishopsgate, Unidata were awarded t...
Read more
Previous Project - Welwyn Data Centre
As principle contractor Unidata undertook a fit out of the data hall 1. These works included the upg...
Read more
Previous Project - London Wall
Unidata were responsible for the 17 floors of a fully occupied premises for 400 staff including 5 fl...
Read more
Previous Project - One New Change
Unidata's involvement was to Introduce automatic Solar Blinds to achieve Building Control requi...
Read more