During the Shell and Core process, Unidata are installing the Riser backbone, Server, and floor containment and cabling for all the floors. Unidata is providing the infrastructure, cabling, switchgear and terminal works for all the intelligent Solar Shade system, which tracks the sun, weather patterns and surrounding structure shadow patterns, to build a completely controllable computer programme, enabling the building to be energy efficient, by saving heating, cooling and lighting consumption and making use of the suns natural light and heat source.
Previous Project - 199, Bishopsgate, London
As part of a ten floor refurbishment program for ABN Amro at 199 Bishopsgate, Unidata were awarded t...
Read more
Previous Project - Welwyn Data Centre
As principle contractor Unidata undertook a fit out of the data hall 1. These works included the upg...
Read more
Previous Project - 250, Bishopsgate, London
Unidata have a team of engineer’s permanently employed at this office location carrying out the mana...
Read more
Previous Project - London Wall
Unidata were responsible for the 17 floors of a fully occupied premises for 400 staff including 5 fl...
Read more
Previous Project - Triton Square
Unidata had responsibility for the ground floor conversion into a data centre of No.1 Triton Sq...
Read more
Previous Project - One New Change
Unidata's involvement was to Introduce automatic Solar Blinds to achieve Building Control requi...
Read more