Data Centre
Project Location: Bedford
Client / End User: Bellwater Ltd
Contract Value: £500,000
Contract Duration: 12 weeks
Complete electrical installation
of a classic data centre, located within an
existing building.
An
upgraded HV supply provided power to the site
with an LV Distribution network delivering dual
supplies to 12 power distribution units. 800
underfloor power outlets were provided to provide
equipment supplies.
3MvA
of containerised standby-power was provided
adjacent to the building with a parallel redundant
UPS system providing stability to the system.
Full
electrical services installation was carried
out including colour coded IT cable containment
system, general lighting and small power, and
a high density security and access control system.
The
complete installation was required to be procured,
installed, fully system tested and handed over
to the client within 12 weeks . As a result
teams of site operatives worked around the clock
seven days a week to deliver the system to the
client ready for occupation.