PTS Data Centre

Project Location:
Bedford


Client / End User:
Bellwater Ltd


Contract Value:
£500,000


Contract Duration:
12 weeks


Complete electrical installation of a classic data centre, located within an existing building.

An upgraded HV supply provided power to the site with an LV Distribution network delivering dual supplies to 12 power distribution units. 800 underfloor power outlets were provided to provide equipment supplies.

3MvA of containerised standby-power was provided adjacent to the building with a parallel redundant UPS system providing stability to the system.

Full electrical services installation was carried out including colour coded IT cable containment system, general lighting and small power, and a high density security and access control system.

The complete installation was required to be procured, installed, fully system tested and handed over to the client within 12 weeks . As a result teams of site operatives worked around the clock seven days a week to deliver the system to the client ready for occupation.