University
College Hospital
Project Location: Euston
Road , London
Client / End User: University College
London / NHS Trust
Contract Value: £400,000
Contract Duration: 90 weeks
Unidata recently conducted
a structured cabling project fot the new University
College Hospital which resides in the Euston
Road This is a state of the art facility designed
to be at the forefront of Medical Technology.
nidata
recently conducted a structured cabling project
The project itself spanned nearly two years,
and covered 31 floors split between two buildings
in a campus arrangement. Some 8,000 Category
6 UTP outlets were installed along with multicore
fibre optic cables servicing the vertical backbone.
In order to ensure the installation was as "future
proof" as possible, multi-way blown fibre
tubes were installed, some of these being utilised
from day one.
nidata
recently conducted a structured cabling project
Although the base build design indicated that
each floor had only one communications room,
diverse wiring routes were utilised to provide
added redundancy and resilience to the installation.
The
UCH project proved Unidata’s ability to
work effectively as part of large team, alongside
widely diverse disciplines, over extended periods
with great success.